Featured Project
Sievert Crane & Hoist was the prime contractor for the intake gantry crane replacement at the Robert S. Kerr Powerhouse Dam, which is owned by the USACE, Tulsa District.
Contact UsThe scope of the project involved the demolition of the existing 50 ton intake gantry crane and manufacture and install of a new 65 ton gantry crane. This project took place at the Robert S. Kerr Powerhouse Dam, which was owned by the USACE (US Army Corps of Engineers), in the Tulsa District.
The project also involved a rail survey, lead & asbestos abatement, new conductor bar, and load testing using water bags.