Eufaula Powerhouse Draft Tube Crane Replacement

Sievert Crane & Hoist was the prime contractor for the draft tube gantry crane replacement at the Eufaula Powerhouse Dam, which is owned by the USACE, Tulsa District.

Contact Us
Eufaula Powerhouse

Project Details

The scope of the project involved the demolition of the existing 20 ton intake gantry crane and manufacture and install a new 25 ton gantry crane. Sievert Crane & Hoist performed this work at the Eufaula Powerhouse Dam, which is owned by the USACE (US Army Corps of Engineers), in the Tulsa District.

The project also involved installing new power feeds, lead & asbestos abatement, and load testing.

Project Details Location Icon Location

Stigler, Oklahoma

Project Details Client Icon Client

USACE, Tulsa District

Eufaula Powerhouse
Eufaula Powerhouse
CTA Background

Ready to start a project?

Sievert Crane & Hoist is ready to help you with your next project. Contact us to request a quote or get answers to your questions.

Quote Icon Request a Quote