GOVERNMENT PROJECTSGovernment/Infrastructure
- US Army Corps of Engineers (USACE)
- Naval Facilities Engineering Command (NAVFAC)
- Department of Defense
Industrial Construction
- Material Handling Systems
- Refurbishment of Existing Systems
- Structural Steel Fabrication, Erection, and Repair
- Concrete Cutting and Core Drilling
- Rigging and Erection
- Equipment Removal or Demolition
- Emergency Repair
- General Maintenance and Repair
- Electrical Demolition and Installation
- Industrial Controls
Designation
- DUNS
- 175693936
- Cage
- 1QQY8
- FEIN
- 36-3491013
- Entity
- S Corporation
- CCR
- Complete
- ORCA
- Complete
- SAM
- Registered in SAM, but our profile is hidden and only available to government users who are logged in
Certifications
- Service Disabled Veteran Owned Small Business

NAICS Codes
- 237990
- Other Heavy and Civil Engineering Construction
- 238210
- Electrical Contractors and Other Wiring Installation Contractors
- 332710
- Machine Shops
- 333923
- Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- 811310
- Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
Sievert Electric and Sievert Crane & Hoist, a division of Sievert Electric, have significant experience with government work for cranes and hoists and also electrical construction. These are some examples of our government work.
Replace Intake Gate Controls, Fort Randall DamRole
Sub-Contractor Owner
USACE, Omaha District Location of Project
For Randal Dam, SD Scope of Project
The project involved replacement of electric controls for 24 gate controlling hoists
- Remove and Replace all equipment associated with gate hoist controls including, Shaft Encoders, Upper Travel Limit Switches, Slack Cable Limit Switches, Master Pushbutton Stations, Inching Pushbutton Stations, and New Gate Hoist Control Cabinets, gate seal air valves , outlet gate Air Vent Position Switch.
- Replace all wiring associated with equipment being replaced.
- Provide new Programmable Logic Controllers (PLC's) that will control the gate hoist per the customer’s requirement.
- Perform operation testing of the controls
- Provide training to the government personnel
- Provide fiber optic cable for communication between government control room and the gate hoist.
Replacement of Monorail Hoist, Beaver DamRole
Prime Contractor Owner
USACE, Little Rock District Location of Project
Beaver, Arkansas Project Duration
October 2014 - June 2016 Project Details
- Remove existing 20T draft tube hoist, electrical power, and conductor bars.
- Install and test new 20T hoist and trolley and conductor bar electrical system
- Install additional monorail track
- Install new safety ladder, platform, and fall arrest system
- Non-destructive testing of the existing lifting beam.
Replacement of Monorail Hoist, Greers Ferry Role
Prime Contractor Owner
USACE, Little Rock District Location of Project
Greers Ferry Powerhouse, Arkansas Project Duration
October 2014 - June 2016 Project Details
- Remove existing 15T draft tube hoist, electrical power, and conductor bars
- Install and test new 15T hoist and trolley and conductor bar electrical system
- Install additional monorail track
- Install new safety ladder, platform, and fall arrest system
- Non-destructive testing of the existing lifting beam.
Draft Tube Crane Rehabilitation, Norfork Dam Role
Prime Contractor Owner
USACE, Little Rock District Location of Project
Norfork Dam, Arkansas Project Duration
October 2014 – December 2016 Project Details
- Demolish the existing 10 ton draft tube gantry crane
- Manufacture and Install a new 10 ton monorail crane and monorail structure
- Provide new power feed, new electrical festoon system and a new lifting beam
- Remove existing fence and construction of new fence
- Demolish existing concrete slab and construct a new concrete slab.
- Lead paint abatement, asbestos abatement
- Operational and load testing (125% of design load)
- Provide training for equipment operation to the government officials
40T Bulkhead Lifter Upgrade and Repair, Dam 15 Role
Prime Contractor Owner
USACE Rock Island District Location of Project
Lock and Dam 15, Mississippi River Project Duration
May 2011 – May 2012 Project Details
- Complete redesign and upgrade of the electrical systems on the bulkhead lifter
- Removal of the existing controls, bridge drives and handled the lead abatement and asbestos abatement associated with it.
- Design new motors and VFD controls for the bulkhead lifter and both 20T hoists and trolleys.
- Everything was installed in the captive dam without removing the crane.
- Remove existing crane electric system.
- Design of 1500ft fully heated and enclosed conductor bar system located directly over the Mississippi river
- Installed everything with 100% our crew of union ironworkers, electricians, and hoist technicians.
- Load tested on site
40T Gantry Crane Upgrade, Nimrod DamRole
Prime Contractor Owner
USACE Little Rock District Location of Project
Nimrod Dam, Arkansas Project Duration
September 2012 – July 2013 Scope of Project
- Complete inspection of 40T Gantry Crane including the crane drive assemblies.
- Inspection and repair of gearing including design and fabrication of replacement gears.
- Design and replacement of the complete electrical system including controls, motors, brakes, and limit switches.
- Value engineering of the design to improve performance and save cost. Controls and motors were converted to a VFD type control system.
40T Crane and Bulkhead Lifter Repair, Lock and Dam 20Role
Prime Contractor Owner
USACE Rock Island District Location of Project
Lock and Dam 20 Mississippi River Project Duration
September 2012 – September 2014 Scope of Project
This one of a kind piece of equipment was severely damaged in a storm. The unit consists of a 40T bulkhead lifter/traveling unit with a 40T Linkbelt crane on top. The combined weight of the unit is approximately 140,000 pounds. The unit blew off the tracks and dropped almost 15 feet off the end of the dam. We disassembled the pieces, inspected the unit to find out the extent of the damage and developed a repair plan.
- Provide new motor and brake for the bulkhead lifter.
- Upgrade to VFD technology
- Perform all the weld repairs
- Sandblast, paint and reassemble the unit.
- Perform load testing and train the government personnel.
Mississenewa Overhead Crane Replacement Role
Prime Contractor Owner
USACE Louisville District Location of Project
Lock and Dam 20 Mississippi River Project Duration
September 2012 – July 2013 Scope of Project
- Remove existing controls, trolley, bridge drives and handled the lead abatement and asbestos abatement associated with it.
- Design a 140ft long lift 20 Ton hoist trolley unit to fit in very tight headroom conditions.
- Design new bridge drive and full new catwalk for crane along with new VFD controls.
- Installed everything in the air without removing the crane.
- Installed everything with 100% our crew of union ironworkers, electricians, and hoist technicians.
- Load tested with water weights on site.

Crane Inspection, Ozark Powerhouse Role
Prime Contractor Owner
USACE, Little Rock District Location of Project
Franklin County, Arkansas Project Duration
September 2015 – February 2016 Scope of Project
- Perform an inspection on the 150-ton bridge crane
- Identify the cause of shavings that were found on the powerhouse bridge
- Provide a comprehensive report of the findings that provides an assessment of the bridge crane in order to ensure operability
- Provide a cost estimate for any repairs that are required, depending on the findings of the inspection.
|